<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
    xmlns:content="http://purl.org/rss/1.0/modules/content/"
    xmlns:dc="http://purl.org/dc/elements/1.1/"
    xmlns:atom="http://www.w3.org/2005/Atom"
    xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
    xmlns:media="http://search.yahoo.com/mrss/">
<channel>
    
        <item>
            <title>Monsoon two days behind schedule, all set to hit Kerala on 3 June - The Daily Guardian</title>
            <link>https://latest.thedailyguardian.com/others/monsoon-two-days-behind-schedule-all-set-to-hit-kerala-on-3-june/</link>
            <guid>https://latest.thedailyguardian.com/others/monsoon-two-days-behind-schedule-all-set-to-hit-kerala-on-3-june/</guid>
            <pubDate>May 31, 2021, 3:27 am</pubDate>
            <description><![CDATA[The arrival of the monsoon over the Indian subcontinent has been delayed by two days. It is now expected to hit the Kerala coast on 3 June, the India Meteorological Department (IMD) said on Sunday. With the possibility of the southwesterly winds to strengthen further gradually from Tuesday, there is a likeness of enhancement in [&hellip;]
]]></description>
            <content:encoded><![CDATA[
<p>The arrival of the monsoon over the Indian subcontinent has been delayed by two days. It is now expected to hit the Kerala coast on 3 June, the India Meteorological Department (IMD) said on Sunday.</p>



<p>With the possibility of the southwesterly winds to strengthen further gradually from Tuesday, there is a likeness of enhancement in rainfall activity over Kerala from 3 June, IMD added.</p>



<p>In a tweet on Sunday, the weather department said, “The northern limit of Southwest Monsoon continues to pass through 5°N/72°E, 6°N/75°E, 8°N/80°E, 12°N/85°E, 14°N/90°E and 17°N/94°E. Due to strengthening of lower level southwesterly winds, fairly widespread to widespread rainfall activity with isolated heavy falls very likely over Northeastern states during next 5 days.”</p>



<p>It further informed about cyclonic circulation over the East-central Arabian Sea off Karnataka coast at 3.1 km above mean sea level, which is likely to meander over the region during the next 5 days. Southwesterly winds are also likely to strengthen during the next 2-3 days.</p>



<p>“Under the influence of these and other favourable meteorological conditions; scattered to fairly widespread rain/thunderstorm likely over Karnataka and Kerala and Mahe and isolated to scattered rain/thunderstorm over remaining parts of south Peninsular India during next 4-5 days,” the IMD tweeted.</p>



<p>The Western Himalayan region and the adjoining plains of north-western India are also likely to experience isolated to scattered rainfall/thunderstorm activity during the next 5 days.</p>



<p>No significant change in the maximum temperatures for the next 5 days was also predicted. “Lower level moisture incursion from the north Arabian Sea to the plains of Northwest India taking place and is very likely to continue during next 3-4 days. Under its influence; no significant change in maximum temperatures very likely during the next 5 days. Also, isolated to scattered rainfall/thunderstorm activity likely over Western Himalayan Region and adjoining plains of northwest India during next 4-5 days.”</p>
]]></content:encoded>
            <media:content url="https://latest.thedailyguardian.com/wp-content/uploads/2020/07/THUNDER.png" type="image/png" width="1200" height="675"/>
            <dc:creator>Correspondent</dc:creator>
            <category></category>
        </item>
</channel>
</rss>